Adam Ratchenski

Senior Attorney

Midwest Office

Adam looks directly at the viewer with a serious expression, as he stands outside in lightly falling snow, in front of a beige colored wall. He's wearing a white collar shirt and dark colored tie under a long black thick winter overcoat, with a brown and burgundy patterned scarf hangs loosely around his neck

Bar Admissions

MN, IL

Adam Ratchenski

Senior Attorney Midwest Office

Timna Axel
Public Affairs and Communications Strategist
taxel@earthjustice.org

Adam Ratchenski is a senior attorney based in Earthjustice’s Midwest office in Chicago.

Timna Axel
Public Affairs and Communications Strategist
taxel@earthjustice.org

Bar Admissions

MN, IL

Quoted in the News

August 6, 2026

WXPR

Michigan Line 5 ruling renews fight over Great Lakes protections

“This is not a case where an agency looked at 95% of the issues and the court said, ‘Just go back and do the other 5%.’ The court rejected the commission’s framework of analysis and sent this back to the drawing board. It didn’t say go back and do a little more; it said go back and do it right this time.”
July 31, 2026

Native News Online

Michigan Supreme Court Overturns Line 5 Tunnel Permit, Delivering Major Victory for Tribal Nations

“This ruling is an inspiring victory for Tribes, environmental advocates, and everyday people who’ve joined hands in the fight to stop the dangerous Line 5 tunnel project. The Court’s decision upholds the bedrock principles of Michigan environmental law.”
February 20, 2025

Michigan Advance

Appeals Court upholds MPSC permit for Line 5 tunnel project

“Nobody wants their water poisoned or their property values torpedoed in order to keep Canadian oil and gas flowing through the Great Lakes.”
January 14, 2025

Bloomberg Law

Opponents of New Enbridge Pipeline Segment Say Evidence Ignored

“The right to present witnesses, evidence, and argument, and to present rebuttal evidence, is part of the rudimentary due process that’s required in administrative proceedings.”

Latest Press Statements

Whitney stands barefoot on a sandy shoreline on a sunny day, as clear waters lap around her feet. The waterbody looks clear and pristine. Whitney looks off to the viewer's right with a contemplative expression, and her arms loosely down by her sides.
July 31, 2026

Tribes Celebrate as Michigan Supreme Court Nixes Line 5 Permit

Enbridge must re-do its application to build an oil tunnel below the Straits of Mackinac
A group of people stand on the bank of a large body of water facing away from the camera, with a large bridge visible on the left of the frame. The shirt on the person on the right reads "NO LINE 5 OIL TUNNEL"
September 19, 2025

Michigan Supreme Court Takes Up Challenge to Line 5 Oil Tunnel

Court will hear arguments by Michigan Tribes and environmental advocates
April 3, 2025

Tribes, Greens Take Line 5 Tunnel to Michigan’s Supreme Court

Tribes and environmental orgs are asking the Court to overturn a state agency’s permit
The Pipe Out Paddle Up Floatilla Against the Line 5 pipeline in Mackinaw City, Michigan, on Sept. 3, 2022.
February 20, 2025

Court Denies Tribes, Green Groups a Line 5 Permit Redo

The Michigan Court of Appeals sided with Enbridge and MPSC on tunnel project
Adam Ratchenski, Senior Associate Attorney at Earthjustice representing the Bay Mills Indian Community, speaks at a press conference after a hearing at the Michigan Court of Appeals in Lansing, Mich., on Jan. 14, 2025.
January 14, 2025

Tribes, Environmental Groups Urge Michigan Appeals Court to Reverse Enbridge Line 5 Tunnel Permit Approval

Michigan panel barred evidence about the public need for Line 5 and its risks
Canoeing the Boundary Waters Canoe Area Wilderness in Northern Minnesota.
September 7, 2023

Judge Tosses Twin Metals Lawsuit, Halting Mine’s Threat to Boundary Waters